Specifications include, but are not limited to: Demolish the 4,611 sq/ft building. Hall off all demotion debris to the landfill. Demolish and hall off the 2400 sq foot parking lot in front of the building. Demolish and remove all footers. Remove and hall off all bollards and parking stops. Demolish and hall off two planters in front of the building. Protect the two large planters SW of the building. Protect the railroad tracks in front of the building. Protect all trees. Protect all driveway inlets. Protect the water tower. Protect all sidewalks outside the footprint of the demolition zone. Total demolition zone estimated at .2 acres. Backfill parking area with road gravel and machine roll. *Final Note: 1 Backfill demolition impressions from the footers with existing soil. Machine role with 3:1 slope. *Final Note 2 The DC shall be responsible for cleaning any mud tracked on the streets and inlets. The Contractor shall provide a Skid Steer Loader with a street cleaning brush. The DC shall be responsible for their worker's OSHA worker's air monitoring. The DC shall be responsible for the temporary fencing with mesh screen and signage. The DC shall be responsible for Erosion Control. The DC shall place straw wattles or equivalent around the perimeter the temporary fencing to protect the park soils. The DC shall maintain a visitor sign-in sheet and have a few extra hard hats and safety vests for visitors. The DC shall submit their inclusions and exclusions from the technical documents. The DC shall submit all pricing in the following manner: Stipulated Sum – Fix price Mobilization Fencing Structural Demolition Demolition debris haul off and trucking. Backfill. Provide road base material cost as a separate line item as the final material for this item might change depending on Parks and Recreation. The DC shall be responsible for assembling and submitting the close-out information and providing TOD with two hard copies and two electronic copies by 45 days after the conclusion of the asbestos abatement. The document shall include but not limited to: Permit Truck manifests and summary Landfill tickets and summary. Daily reports Non- Conformance and Corrective action forms. (if any)