Specifications include, but are not limited to: The City of Statesboro’s Engineering Department is requesting for proposals of professional design services to design intersections to allow for turn lanes to accommodate projected traffic data for the proposed area under the project name: 2024 RFP ENG-123f: Cawana Road Intersection Improvements. The design efforts will look into the possibilities of right turn yields, concrete islands, traffic signal (if warranted), and a Georgia Department of Transportation (GDOT) standard ICE analysis conducted. If a traffic study is not warranted by the ICE analysis, then ensure that all necessary infrastructure, i.e., pull boxes, conduit, etc. are accounted for along with adequate ROW for a traffic signal in the future. Plan Presentation format will be per Georgia Department of Transportation (GDOT) PPG and reflected in the final design. All design must be in accordance with the latest AASHTO, MUTCD, and GDOT Standards and Specifications.