Specifications include, but are not limited to: LCCC desires to construct its new residence hall, and necessary parking, immediately adjacent to the west side of the current residence hall complex. 2.Develop a facility program summary to include summary of spaces; described by name, purpose, area, # of people accommodated, and description of space function. This summary will identify critical assumptions, define overall concepts, specifically for the three occupancy scenarios mentioned above. 3.The Selected Firm will provide a detailed facility program, equivalent to completed Level 1 (Reconnaissance) and Level 2 (Feasibility) planning studies, up to and including a schematic design. This will include drawings and written narratives that establish all major parameters of facility design. Deliverables to include, but not limited to: Proposed facility schematic design Proposed floor plans and room layouts, including estimated square footage (both gross and assignable) Total project cost estimates, with breakouts of anticipated sub portions, such as; construction costs (including site development), soft costs (design fees, geotech, surveying, material testing, planning fees, etc), and FF&E. Proposed project schedule including programming, funding, design & construction with occupancy occurring in August of 2020. Renderings sufficient for publishing to the community. Completion of work under this proposal no later than October 31, 2017