Specifications include, but are not limited to: Base Scope of Services All services shall be executed in accordance with the procedures included in SP2020 Stations & Facilities Standard Design Practices dated 2020 (hereafter, SP2020s), unless noted otherwise below. Task 1: Preliminary Design Services This task includes the A/E analysis and design work needed to produce the Preliminary Design deliverables, taking into consideration all input and feedback from Amtrak and other affected stakeholders. The Design Contractor shall provide a 30% (Preliminary) Design to illustrate their recommendations. On overview of tasks is listed below: Review Available Existing Documentation The facility provides amenities to over 50 employees including on board train crew members, mechanics, and administrative offices. Amtrak will provide 2022 SOGR assessment, archival drawings from original construction, as available. Hard copies and some record documents are available. Conduct an On-Site Survey Work will include but will not be limited to, a survey of existing space to very and supplant on archival documents. Work shall include preliminary design for the Project. Reconfigure and refurbish up to 7 offices in the administrative area breakroom enhance open space utilization. Optimization and expansion of crew area. Work out room repairs. Entrance and conference room refresh with new furniture and AV system. Update lunchroom Renovate men’s, and women’s locker rooms. Training room refresh with new furniture and AV system. Restroom improvements Structural remediation to interior and exterior roof – gutters and downspouts, replacement, and repair of up to 9 exterior doors, walls, replacement and repair of windows, and exterior side panels. Exterior lighting – LED lighting MEP assessment. Elements to be designed for 20-year life expectancy. Defining what the Amtrak expansion and occupancy will be in its current operational footprint within the Admin Building Construction schedule phasing – employees will continue to operate out of this location during the construction period. 15% (Conceptual Design) Submission 30% (Preliminary Design) Submission