Specifications include, but are not limited to: 1. General: a. Total project consists of one (1) roof area totaling approximately 4,080 square feet. See roof drawing RP-1. b. Provide required project submittals. Do not commence work without approved submittals and FM Approval. c. Submit FM Global’s Application for Acceptance of Roofing System, contractor form X2688, attached to Section 01330, or FM approved RoofNav contractor application procedure packet. Proof of FM Global application and FM Global approval is required as part of the submittal process before work may commence. d. Distribute construction related loads to prevent damage to the structure. The roofer is to inspect the construction related areas before work to ensure the roof can accommodate the construction related loads and activities. Provide adequate precautions to secure the area before work commences. e. Coordinate work with the owner’s operation to ensure the building remains watertight and in operation during construction. f. All flashing heights must meet or exceed 8-inch minimum requirement, unless otherwise noted.