Specifications include, but are not limited to: Provide Design Services and Construction Document Development for the Sugarloaf Parkway Extension Phase 2B. The items outlined in this request for proposals to provide construction document development for an approximate 1.5 mile extension of Sugarloaf Parkway from SR 124/Braselton Highway to I-85. Award will be made on the basis of the criteria as outlined in this proposal document. The Sugarloaf Parkway Extension project is intended to provide improved mobility between the northern part of the County (City of Buford/Sugar Hill/Suwanee area) and the eastern region of the County (SR 316/City of Dacula) and thereby reduce traffic congestion created by commuter traffic during peak travel periods. With SR 20/Buford Drive , SR 316/University Parkway, SR 324/Gravel Springs Road, and several county-maintained roads, such as Old Peachtree Road, Dacula Road and Fence Road currently experiencing high traffic volumes, the Sugarloaf Parkway Extension project will enhance overall traffic movement in the area of Gwinnett County by providing much needed cross-country connectivity. Additionally, the reduction in traffic congestion through the diversion of traffic from other arterials and the addition of turn lanes at major intersection and interchanges along the corridor would reduce the frequency and severity of rear-end and angle collisions along existing arterials throughout the corridor.