1. Temporary Erosion and Sediment Control Measures Lump Sum 1 $ _______ $ __________ 2. 4-inch polyethylene gas main with pipe detection wire (PEGM-1) Linear Foot 3,400 $ _______ $ __________ 3. 4-inch polyethylene line valve with valve box and collar (PEGV-1) Each 2 $ _______ $ __________ 4. 2-inch polyethylene line valve with valve box and collar (PEGV-1) Each 1 $ _______ $ __________ 5. Connect to existing 4-inch MDPE gas main (45-psig) Each 1 $ _______ $ __________ 6. Connect to existing 2-inch MDPE gas main (45-psig) Each 1 $ _______ $ __________ 7. Add-on for Untrenched Wetlands/Culvert Crossing Lump Sum 1 $ _______ $ __________ 8. Add-on for Untrenched Pavement Crossing Linear Foot 100 $ _______ $ __________ 9. Cut & Cap 2-inch PE Gas Main (45 psig) Each 2 $ _______ $ __________ 10. Record Drawings, including DIMP information (material data) Lump Sum 1 $ _______ $ __________ 11. Rock Excavation, if required and authorized Cubic Yard 20 $ 250.00 $ 5,000.00