Colorado Mesa University (CMU) seeks a qualified CM/GC partner to provide construction management
services for the expansion of the campus geothermal system, the integration of the geo-exchange system
into the balance of CMU facilities, and the construction of additional interconnected facilities in the
planned mixed-use zone of campus currently referred to as the Formation District.
The project is expected to be implemented in multiple phases. The construction manager selected
through this RFP (Request for Proposals) will collaborate with CMU to develop a phasing plan and
subsequently release bid packages for the various scopes of work identified below. These work packages
will cover the implementation of either the entire scope or specific parts of the project:
Funding is currently available for the following scopes of work:
• Extend Central Loop to Moss Performing Arts Center, Lowell Heiny Hall, & connect back into
main loop at Wubben Science Building
• Extend Central Loop to New Theater, & connect back into main loop north of Bunting Hall
• Extend Central Loop to Walnut Ridge Apartments, Pinon Hall, Tolman Hall, Rait Hall, Albers Hall,
CMU Admissions & Student Housing Offices
• Drill new well field on west half of rugby pitch
• Drill new well field east of CMU Center for Reflection
• Drill remainder of infield at CMU track complex
• Drill new field in parking lot CP6 (North of CMU Outdoor Program)