APEX PARK AND RECREATION DISTRICT needs replacement of the EPDM roof over the area north of the main concourse at the Apex Center. This is the area above the administrative offices, the walking track, the basketball gyms, child watch, the fitness areas, the fitness gym, climbing wall, and the indoor playground.
- Prepare the roof for the installation of the new roofing system by removing and disposing of all wall and curb membranes. Remove and properly dispose of the existing metal coping wall cap. Move existing ballast to the side while installing the new roofing system. Install one layer of new 1/2” fan fold insulation board as a separator between the existing roof and the new roof. Install a new 60 mil EPDM roofing system directly over the new cover board. All walls, pipe penetrations, curbs and any miscellaneous penetrations will be flashed. The new membrane will extend up the wall over the top of the existing wood nail board and down the face of the building approximately 3”. Install new prefinished metal coping cap and clip directly over the new membrane walls. Existing expansion joints will be removed. Backer Rod will be installed in the joint, new membrane will be installed up and over parapet wall. Expansion joint on south wall can be reused due to condition with existing stucco. Proper termination will be made by running new membrane up inside of existing expansion joint. New strip in flashing shall be installed. New Scupper sleeves will be installed. Rock ballast will be redistributed at 10lbs/sq ft per uplift requirements.