Specifications include, but are not limited to: The Village has approximately 122.6 miles of water mains it is looking to acoustically test over a two-year period. The system includes approximately 1,598 mainline valves and 1,511 fire hydrants. Every accessible fire hydrants auxiliary valve will be monitored within the proposed area. It is not necessary to monitor curb-stops during the detection phase unless a suspected leak has been detected in the vicinity. The proposed work consists of the following: 1. During 2024, the contractor shall acoustically locate the north side of the Village (as shown in the attached map). The water system on the north side is approximately 61.9 miles long with about 837 mainline valves and 683 fire hydrants. 2. During 2025, the contractor shall acoustically locate the south side of the Village (as shown in the attached map). The water system on the south side is approximately 60.7 miles long with about 761 mainline valves and 828 fire hydrants. Maps of the water distribution system will be provided to the selected Proposer.