The scope involves reviewing referenced structural, electrical and mechanical drawings to determine the full scope of the project. The contractor must purchase and install specified equipment and maintain existing functionality. The contractor must also demo equipment per drawings. All equipment that is demolished must be left on the job site; the contractor will coordinate with Yuma County Facilities Management HVAC Supervisor to transport demo equipment to storage yard at 2725 S. Avenue B, Yuma, AZ. The storage yard and job site locations are adjacent to each other. The contractor is responsible for removing all trash from the jobsite at the end of each equipment installation. The contractor will invoice per Exhibit A page 1 and include closeout documents.