Specifications include, but are not limited to: Remove existing bridge and construct a new precast prestressed concrete deck beam bridge and approaches involving: 1 LUMP SUM TRAFFIC CONTROL & PROTECTION, SPECIAL 0.1 ACRES TREE REMOVAL, ACRES 96 CUBIC YARDS EARTH EXCAVATION 200 CUBIC YARDS CHANNEL EXCAVATION 84 CUBIC YARDS FURNISHED EXCAVATION 150 TON POROUS GRANULAR EMBANKMENT 640 TON STONE DUMPED RIPRAP, CLASS A5 426 TON AGGREGATE BASE COURSE, TYPE B 1 EACH REMOVAL OF ESISTING STRUCTURES 28.4 CUBIC YARDS CONCRETE STRUCTURES 3.4 CUBIC YARDS CONCRETE ENCASEMENT 1,904 SQUARE FEET PRECAST PRESTRESSED CONCRETE DECK BEAMS (33" DEPTH) 3,640 POUNDS REINFORCEMENT BARS, EPOXY COATED 132 FOOT STEEL RAILING, TYPE S-1 180 FOOT FURNISH & DRIVE STEEL PILES HP 10x42 1 EACH TEST PILE STEEL HP 10x42 10 EACH PILE SHOES 1 EACH NAME PLATES 4 EACH TERMINAL MARKERS - DIRECT APPLIED