Specifications include, but are not limited to: RSU Stairwell Plaster and Paint: • Please supply materials and labor for vestibule and stairwell area. Framing and drywall at acoustical soffit area. (See Wall Framing Area). • Apply mesh and plaster on stairwell and vestibule walls. • Paint all plaster walls including drywall at the acoustical soffit area. • BSU has the option to pick from three paint colors. • Paint newly applied plaster for both stairwell and vestibule walls. • Approximate ceiling height vestibule area: 8’ • Approximate ceiling height 2STAIR-04 area: 15’ • Approximate ceiling height 1STAIR-04: area: 14’ • All receptacles and handrails are to remain and not be removed during plaster and paint. (See Item 1). • TV and bracket, bulletin boards will be removed by BSU. • GC to provide their own dumpster. • All ceiling and light fixtures to remain. • Protect all finishes – stairs, treads, railings during work. • All damage is the responsibility of the contractor.