Dig and prep all areas where new Asphalt will be installed Compact all Gravel granular base Install 12” of Gravel granular base for new driveway Install 6” of Gravel granular base for sidewalk Asphalt install should be no less than 3 ½” thickness for the new Driveway areas Asphalt install should be no less than 3 ½” thickness for the new Sidewalk areas New pavement areas should have a Binder course and top course Prep all existing driveways and parking lot areas for a top course cap Top course cap shall be no less than 2” of Asphalt The new asphalt should be continuous, with no seems, where the new driveway and existing driveway top course cap meet. Thoroughly clean finish surface area free of dirt, sand gravel and debris. Apply painting/striping to parking lot area Install curbing around the indicated grass area on the diagram Provide a 1 year warranty