Specifications include, but are not limited to: The City of Scottsdale invites sealed submittals to provide all labor, equipment, and materials to provide construction services for public improvements for the Shea Boulevard intersection and sidewalk Capital Improvements project for the City's Traffic Engineering department with specific improvement locations at 1) Via Linda, 2) 110th Street, 3) 112th Street to 114th Street and 4) 136th Street. Construction services includes but is not limited to demolition of existing improvements, grading and subgrade preparation, concrete curb, gutters and sidewalks, concrete structures, storm drain catch basins and piping, roadway paving, traffic control and barricading, pavement striping and markings, traffic signing and signalization, irrigation and sprinkler system modifications, and landscaping restoration. Bidder/Contractor is advised that the Shea Boulevard Moratorium (starting 11/25/2024 and ending immediately following Spring Training) will impact the 1) Via Linda, 2) 110th Street and 3) 112th to 114th Street intersections, so commencement of Work at these intersections shall occur first.