Specifications include, but are not limited to: A1: Main Lobby Seating - There are seven existing wooden benches In the Main Lobby on the First Floor of Union Station Building. However, in order to provide enhancements for patrons and events, the removal of the center three benches is proposed. In their place easily movable/repositionable, supplemental seating for the adjacent retail/food tenants will be created where the station patrons can enjoy the space and find places for waiting, relaxing and eating. The scope includes environmental assessment and abatement, removal of the designated existing wood benches, restoration of any floor surfaces impacted by the removal of the benches, demolition of any affected electrical conduit, and providing new easily movable / flexible seating and tables which offer a variety of adjustable seating patterns. A2: Outdoor Flex Seating & Patio - The outdoor flexible seating and patio near the northeast corner (Project North is towards Union Avenue) will be a new amenity at Union Station. This outdoor space is located between the existing parking garage and Union Station Building. A portion is expected to be leased to a vendor to operate. Most likely, it will be associated with a new planned restaurant on the inside of the Building in the northeast corner (see F3), which will also operate the outdoor seating and patio. A second purpose in this area is to establish an area for events such as a farmer’s market or temporary cultural activities. The scope includes environmental assessment and abatement, hardscape, landscaping, new fencing and modifications to existing fencing to properly cordon off and secure the area(s), accessibility upgrades, electrical power distribution, water service, lighting, exterior furniture and other necessary features. A3: Bike Station/Garage Concession Spaces - The Bike Station/Garage Concession Spaces is a new amenity service which is intended to enhance activity and vibrance on Union Avenue by creating new commercial spaces as well as providing bicycle storage. This use is planned in the front, street level bay of the Garage. The commercial space will be created toward the street, and the bicycle storage in the rear parking row, which will be accessed through the Garage. This amenity involves modifications to precast façade panels and brick wall to facilitate access from the public sidewalk, along with connections to the interior of the Garage. This item will be advanced to the design stage only, as part of the Enabling Project - Phase 1. The scope includes the design services for creating a “white box” (e.g., environmental assessment and abatement, perimeter walls, storefront doors, electrical, lighting, plumbing, HVAC, fire sprinklers, sewer lines) for the commercial space, waterproofing membrane above the space and other weatherproofing items required to enclose the commercial space, modifications to the brick wall and decorative precast façade to accommodate new pedestrian openings to the commercial space, and bicycle storage facilities...