Specifications include, but are not limited to: • Protection of building, flat roof, and landscaping with a roof to ground debris system. Removal of existing shingle roofing system down to existing vented nail board. Nail board to be inspected for rot or damage. Compromised nail board will be replaced as needed at an additional cost from the bid. Installation of GAF ice and water membrane approximately 6 ft. up from gutter edge and around any penetrations. • Installation of F8 edge metal to roof perimeter. • Installation MFM 4” wide seam tape to plywood decking as applicable. • Installation of Synthetic Underlayment to roof deck where applicable. • Installation of Eave/Rake Starter Strip starter shingles to roof perimeter. • Installation of architectural shingles similar to GAF Timberline Lifetime HDZ Series. Installation of flashing components, including step flashing, counter flashing, and pipe boots,where applicable Installation of Ridge Vent where applicable. Installation of Rooftop Intake in areas where the shingle roof meets lowslope/flat roof. This will require ventilation calculation to determine amount quantity needed. Installation of color matched hip and ridge caps. • Installation of a Passive Roof Louver if needed. The installation of the vent will be at an additional cost from the bid. Roof to be left water tight and site cleaned each day. Clean up and removal of all job-related materials into container provided by Roofing Contractor shall be included. Dumpsters can be placed in the grass areas and/or paved areas as close to the work area as possible. • Magnets to be used as part of clean-up to pick up any remaining nails. • Include minimum 30 year Warranty. • A lift will be made accessible onsite for use during the project...