• Contractor will make any repairs needed to track prior to spraying • Contractor will clean surface as needed for adhesion. • Contractor will mask offfence, sidewalks and other adjacent areas to avoid overspray • Contractor will apply 2 structural spray layers to be applied uniformly at a rate ofnot less than 1.6 lbs per square yard per layer • The 2 layers shall be sprayed in opposite directions in order to achieve a uniform application on all polyurethane surfaces within the stadium • Contractor will ensure existing drainage is left intact and functional upon completion of project • Structural spray color to be same as existing • Structural spray to be applied to all areas with existing poly mat structural spray surface • Contractor will paint all color coded metric striping per National Federation ofState High School Associations • Contractor will provide a bid bond of 5% with the sealed bid, awarded contractor will provide a performance and payment bond for 100% of project cost.