Specifications include, but are not limited to: The Vendor shall supply all equipment and services to complete semi-annual inspections and testing to the fire suppression system located at Pinckneyville Correctional Center. Inspections and testing must comply with NFPA regulations and must be performed by a NFPA certified professional. The following shall be inspected on a semi-annual basis: Four (4) Dietary Hood Fire Suppression Systems at Pinckneyville Correctional Center One (1) Dietary Hood Fire Suppression System at DuQuoin Impact Program Upon completion of each semi-annual inspection and testing, a report shall be provided to Chief Engineer and Business Administrator at Pinckneyville Correctional Center at a minimum the following items inspected. Distribution piping secured. Sprinkler heads and temperature bulbs located properly. Remote pull unobstructed. Pressure gauge in normal range. Automatic detection fully operational and compliant. Remote manual pull station operational and compliant. Gas fuel supply inspected. Gas fuel supply inspected and gas system shunt trip shut-off operational. Report shall include Water flow test, Riser Size, Drain Size and Static PSI. For procurements conducted in BidBuy, the State may include in this contract the BidBuy Purchase Order as it contains the agreed Supplies and/or Services.