Specifications include, but are not limited to: • Contractor will demo parking and driving lanes and haul material off site • Contractor will grade area and install compacted rock base - 6 inch minimum • Contractor will use 6" pavement for parking areas and 8" pavement for bus lanes - bids for Asphalt or Concrete should be submitted separately and/or as alternate bids. • Contractor will replace curbs around islands and the sidewalks • Contractor will apply parking lines to owners specs or matching exisiting • Contractor may provide an add on cost for replacing the sidewalks along the front of the building, as well as the add on price of replacing the water main under the existing parking lot. • Contractor will ensure that the drainage system still functions as intended (the slope of the parking lot channels water to the existing drainage systems)