Specifications include, but are not limited to: 1. Remove existing coping cap and scuppers 2. Tear off existing roof down to the metal deck 3. Properly Flash all curbs, penetrations, drains, scuppers, and walls. 4. Roof Insulation Base Layer; minimum (2) layers of ISO insulation = R30 5. Roof Insulation Tapered Crickets to drains 6. Install minimum ½” cover board 7. Install 60-Mil TPO membrane fully adhered up and over parapet walls. 8. Install (2) 8 ft curbs for rooftop equipment to mount 9. 170 linear feet of walk tread to ensure roof is not damaged servicing HVAC equipment 10. Provide new coping, match color of existing 11. Install and flash new overflow scuppers 12. Roof warranty will be minimum 20-year manufacture warranty