Specifications include, but are not limited to: • Remove all exis�ng rubberized track surfacing from the running track, high jump event area, long jump runway, pole vault runway, and pole vault landing area. • Remove and dispose of the exis�ng running track asphalt base. The concrete base for the high jump event area, long jump runway and pole vault event area are to remain. The exis�ng track edge drain is to remain. • Reconstruct the running track subbase per the geotechnical inves�ga�on recommenda�ons. • Pave a new asphalt base. • Furnish and install new synthe�c track surfacing. • Paint track and runway markings. • Alternate No.1 – Remove and dispose of exis�ng perimeter chain link fencing and gate. Furnish and install new 4’ height chain link fencing and gates. New fencing will be installed in a concrete curb. • Alternate No.2 – Reconstruct the exis�ng shot-put event landing area. • Alternate No.3 – Reconstruct the area directly to the east of the chute currently surfaced with loose laid synthe�c turf. • Alternate No.4 – Furnish and install a Beynon BSS 300 (or approved equal) track surfacing in lieu of a BSS 100 (or approved equal) track surfacing.