The contractor shall install fast drying 4 inch traffic paint as well as new hot-melt thermoplastic pavement markings. The work hours shall be between the hours of 8 pm to 8 am. The contractor shall be in charge of completing the following work: • Refresh skip and dotted lane line with paint over existing markings • Refresh double lane line with paint over existing markings • Refresh existing turn arrows with thermoplastic • Refresh existing "fish hook arrows" with thermoplastic • Refresh existing combination arrows with thermoplastic • Refresh existing yield line "sharks teeth" with thermoplastic • Refresh existing crosswalk lines ("piano keys") with thermoplastic • Refresh existing stop line and various lane lines with thermoplastic The contractor will be responsible for providing all labor, equipment, materials, and other requirements for the application of hot-melt thermoplastic pavement markings in accordance with the current Federal Highway Administration and Tennessee Department of Transportation standards, as appropriate, for the materials and workmanship, as amended. At all locations the contractor willsupply adequate traffic control devices, cones, flaggers, etc. asrequired to comply with the work zone standards in the latest and current edition of the Manual on Uniform Traffic Control Devices, as amended. The contractor will provide his or her own escort vehicles and drivers, as required. The contractor will be responsible for the disposal of all waste products in accordance with the appropriate state, federal, and local laws. The Contractorshall be responsible for final measurement of applied thermoplastic, lay-out work and all traffic control during the project. The contractor will be paid per linear foot for 4-inch traffic paint, thermoplastic stop bar, and yield line. Arrows will be paid based on per arrow.