Specifications include, but are not limited to: The project will include development of the new pump station with an onsite water treatment system for removal of iron and manganese, storage tank for filtration wastewater, chemical building to house disinfection system with sodium hypochlorite, and piping system to pumped finished water directly into the distribution system. The work to be completed under this contract consists of furnishing all materials, labor, equipment, fuel, and tools required to construct the Well No. 8 pump station for the District as illustrated on the Drawings, and as detailed in these Specifications. The scope of work includes but is not limited to mobilization to the jobsite; grading and excavation of the site; installation of all underground piping and electrical service; installation of the well pump along with associated electrical and station piping; installation of filter and associated electrical and piping, installation of storage tank and associated piping, painting of all metal surfaces; installation of disinfection equipment; construction of concrete masonry unit chemical building; an emergency generator; all paving around and to the site; disinfection and testing of all equipment; cleanup and demobilization.