Removal of existing built-in laboratory cold storage rooms and limited tenant improvement to finish the adjacent spaces in usable condition. Miscellaneous demolition in rooftop penthouse area housing existing pumps/ compressors/ controls. Scope includes: • Removal of six laboratory cold storage rooms and all associated systems (mechanical, refrigeration, plumbing, electrical, communications, etc. as noted). • Select demolition of improvements to adjacent lab spaces. • Hazardous materials removal that is impacted by cold storage room removal/ demolition activities. • Limited tenant improvements including, but not limited to, wall infill/ patch/ repair, doors, painting, floor leveling. • Minor modifications to existing HVAC systems. • Modification to fire sprinkler system. • Installation of convenience power and lighting in areas where refrigerators/ freezers have been removed. • All work will occur within an existing, fully occupied building