Project consisting of approximately 37,169 C.Y. of excavation; 56,638 tons of classified fill and backfill; 1,224 L.F. of curb and gutter removal; 16,913 S.Y. of pavement removal; 2,480 tons A.C. pavement; 6,223 L.F. curb and gutter installation; 40 curb ramp installations (various types); 126,990 S.F. insulation installation (R-9); 11,530 S.F. insulation installation (R-4.5); 1,469 S.Y. P.C.C. sidewalk (various thicknesses); 1 soldier pile retaining wall; 3,944 LF of storm drain pipe (various sizes); 38 storm drain manholes (various types); 30 storm drain catch basins; 1 oil and grit separator; creek channel reconstruction; 178 L.F. of culvert pipe (various sizes); 18 roadway luminaires; 1 type 1A load center; 3,145 L.F. water pipe (8”); 24 gate valves (8”); 8 fire hydrants; 20 water services (various sizes); temporary water system; irrigation system; and related work.