Specifications include, but are not limited to: Concrete walk, catch basin and drain • Concrete demo. • Catch basin demo and replace with new 30” structure. • Upgraded 6” line to storm sewer and cap existing 4” line currently in existing structure. • Install new spillway approximately 60’ to divert water to ditch. • New Concrete Sidewalks and stoop. • Broom finish & seal. • All cleanup necessary. • Landscaping. Storm Sewer Downspout From Building: • All Labor and materials included to add new downspout drainage to existing down spot to new storm sewer structure. Landscaping Included. Storm Sewer Catch Basin Repair: • All Labor and materials to repair storm sewer catch basin where erosion is happening. Landscaping Included.