Specifications include, but are not limited to: Project Scope: Limits of the project include approximately 800 linear feet on South Street (Segment 1) from Jefferson Street to State Street. Preplanning through the Construction Document Phase of repairs or replacement of sidewalks, driveway aprons, and curbs/gutters; install ADA improvements at intersections, repairs or replacement of utilities and drainage systems (as determined by engineering investigation); pavement repairs; milling and asphalt overlay, and pavement striping to match existing. Engineering design will include investigation of utilities to determine the need for water and sewer rehabilitation/replacement. As all infrastructure belongs to the City of Jackson, professionals 5 will be required to coordinate all work with the City of Jackson and JXN Water Inc. Data/Communications: Professional will coordinate any State of MS data communication related work with Mississippi Department of Information Technology Services (ITS). ITS involvement will begin at the Schematic Design Phase, where applicable.