The Contractor will be responsible for all materials, labor and equipment required to install a second restroom inside the Electric Maintenance Shop. The restroom will be adjacent to the existing restroom. The new structure will utilize a block wall between the two restrooms. The restroom will be approx. 80”x 80” and match the height of the existing restroom. The new structure will be studded out with 2x4’s and covered on the exterior and interior with sanded smooth plywood sheeting. The new structure will be trimmed out with 1x4’s and 1/4 x 1 ½ lattice strips. The Restroom will be painted white on the exterior and interior. The Contractor will be responsible for assuring that the new facility is ADA Compliant with all regulations and rules required to give physical access to people with disabilities. The Contractor will be responsible for installing (1) back flow toilet, (1) on demand water heater, (1) light, (1) vent fan, (1) sink, (1) paper towel dispenser, (1) grab bar, (1) liquid soap dispenser. The Contractor will be responsible for any and all electrical & plumbing as needed to operate the new facility. The Contractor will be responsible for making any repairs for any structural damage made during this project. The Contractor will be responsible for proper disposal of debris from the work station. The Contractor will acquire all permits and perform 811 locates as required for the purpose of this project and abide by all laws and legal dates.